Let's face it. Times are tough. Tighter budgets. Shorter timelines. We're here to meet these new realities. See some example projects below.

Automaxx Car Dealership

Automaxx Car Dealership

Automaxx Car Dealership

image30

Over $100,000 saved in operating and capital expenditures. Mechanical and electrical building permit drawings for a new Automaxx car dealership in Calgary, AB. 

Evangel Church

Automaxx Car Dealership

Automaxx Car Dealership

image31

In just 2 weeks Forte completed building permit drawings. They included mechanical and electrical drawings to meet a client deadline for a new Pentecostal Church in Calgary, AB.

Helium Gas Extraction Facility

Helium Gas Extraction Facility

Helium Gas Extraction Facility

image32

Forte was hired by Thor Resources to review the proposed design and provide feedback. The review resulted in 150 points to consider in the design of the facility to ensure safety and a high helium percentage output.

Saskatchewan Oil Battery

Helium Gas Extraction Facility

Helium Gas Extraction Facility

image33

A Vermilion Energy oil battery in SE Saskatchewan was having difficulty keeping up with production. A debottlenecking process was initiated and resulted in an additional 7,000 bbls of liquid. 

Drainage Design and Plan

Drainage Design and Plan

Drainage Design and Plan

image34

Sentinel storage had an existing leakage problem and needed to remedy an existing storage facility in Calgary, AB. Forte was hired to produce a DSSP application, including drainage drawings and details based on an environmental assessment. The project was initiated, drawing package completed, and submitted to the City of Calgary for approval in less than 4 weeks.

Modular Campsite

Drainage Design and Plan

Drainage Design and Plan

image35

Pacific Canbriam Energy required electrical drawings for the new modular campsite located in Northeast BC. Forte provide a full package as well as onsite visits post construction to verify installation. Forte worked closely with the electrical contractor and internally with its team of engineers to meet deadlines. A site visit and inspection along with the Schedule C-B was completed in one day.

Rail-loading Facility

Amine Filter Replacement

Amine Filter Replacement

Tidewater rail loading facility Acheson, AB

Tidewater Midstream was building a new rail loading facility in Acheson, AB and required electrical engineering and design for it. Forte provided a complete electrical engineering package.

Amine Filter Replacement

Amine Filter Replacement

Amine Filter Replacement

image36

Enbridge was replacing their Amine system and required mechanical and electrical design and engineering. Forte provided a complete drawing package issued for construction

Get In Touch

Drop us a line and we'll get back to you ASAP!

Better yet, see us in person!

We love our customers, so feel free to visit during normal business hours.

Forte Engineering Solutions Inc

639 5 Avenue SW, Suite 2500, Calgary, Alberta T2P 0M9, Canada

(403) 775-2266 info@forteengsolutions.com sales@forteengsolutions.com

Hours

Open today

08:00 a.m. – 06:00 p.m.

Subscribe

Sign up to get free engineering tips